Saturday 15 February 2014

15.2.2014 Light Fittings Update

Finally all our light fittings have been changed now. The house is starting to look more like how we envisaged. The baton lights from the builder did not do any justice to the place. Our kitchen looks really hot with the down lights and the lovely chrome pendant lights. All the appliances have also been installed and make the kitchen complete. 

Living Room too looks fab with so many down lights. In our corridor we have down lights connected with sensors which gives a great feel as you come out of the rooms. All our lights at front of the house are also connected with sensor which is looking good too. Our electrician have also installed our Bosch alarm system so we are at peace that the house is secured. We are getting our Air con installed next week. we have gone with  15kw 4 zones and 9 outlets Ducted Inverter system. 

I would really like to thank our electrician Tony and his boys for such a great job. 

Meanwhile all the measurements for the blinds, Plantation shutters and flyscreens for windows have been completed and all orders have been placed. Hoping for the flyscreens and blinds to be installed in a week or two but our Plantation Shutters might take up to 6 weeks. Our 2 Nick Scali lounges for the living area have also been delivered and we are still taking boxes every time we visit our house. Few more weeks before we move in. 

Outside is a mess at this stage and needs a lot of work. Thats something we will tackle after we move in as our next door house is few weeks away from completion and I spoke to the builder who is going halves with us in leveling the land and we will get it done in one go and then get the fencing done. Something I noticed today that our rainwater tank is full and excess water is coming out through an overflow pipe and into the backyard. The back yard was flooded with water and the soil was so soft that I almost got stuck in the soft mud. The overflow outlets should have been connected to the drainage system but looks like its not or something is not right. I will be ringing my SS on Monday to get some answers as MDJ charged us $2000 for the connection.


































No comments:

Post a Comment