As I wrote in my last post that tiling was completed and painting had started. I went for a visit to the house today and met up with our site supervisor. I was really happy with the tiling job and it looks great. The vanities have also been installed and they blend in well with the tiles. The ensuite and the second bathroom have had the Caesarstone bench top installed. We went with Atlantic Salt and it looks good.

I was most anxious to see our kitchen bench tops. The guys were in the final process of getting the bench installed.

 OMG ….it looks great. The kitchen has come alive. Believe me the picture do not do justice but it looks great. The kitchen bench is Caesarstone Osprey and will look great when all our light fixtures and downlights are installed.

I was also surprised to see that the entire house had its first coat of paint completed already. Our internal wall colour is Taubmans Phantom Dream and that too looks good. The supervisor was going through his checks and marking walls and areas that needed fixing. He will be getting the gyprock guys to come fix the plastering and other bits and pieces before the final coat.


I spoke to him about the handover and he reckons he will be in better shape to tell me by the end of November. He is pushing for before Christmas handover which was great to hear. Fingers cross we might be lucky…..